ZP ELEKTROKRAJINA a.d. Banja Luka

WINTER - V

Rate conditions for active and reactive electric energy in higher season (winter – VS) are applied from October 1st till March 31st, according to part of a day:

- Higher rate (VT) from 06.00 till 22.00h

- Lower rate (MT*) from 22.00 till 06.00h

HOUSEHOLDS

Estimed power Higher rate (VT) Lower rate (MT)
I Rate group 4.95 0.1044 0.1044
II Rate group 7.80 0.1304 0.0652


OTHER CONSUMPTION

Estimed power Higher rate (VT) Lower rate (MT) Reactive energy
I Rate group 13.22 0.0708 0.0354 0.0355
II Rate group 20.25 0.1675 0.1675 -
III Rate group 20.25 0.2094 0.1047 0.0426
VI Rate group 28.35 0.1044 0.1044 -
VII Rate group 28.35 0.1304 0.0652 0.0426

SUMMER - NS

In keeping with rules of time counting, inserted meters are not changed, and rate conditions are applied in lower season, according to part of a day:

- Higher rate (VT) from 07.00 till 23.00h

- Lower rate (MT*) from 23.00 till 07.00h

 

HOUSEHOLDS

Estimed power Higher rate (VT) Lower rate (MT)
I Rate group 3.30 0.0696 0.0696
II Rate group 5.20 0.0870 0.0435

Electric energy that is delivered on Saturday and Sunday (from Friday at 22 (23)h to Monday at 6 (7)h) and during public holidays is calculated by lower rate conditions (MT) if the customers provide such measuring.

Elektrokrajina Info Rates Consumer on low voltage