2 сеп, 2011
CONSUMPTION CATEGORIES HIGH-VOLTAGE Consumption at 110kV voltage For consumers who take electric energy at 110kV voltage. Consumption at 35kV voltage For consumers who take electric energy at 35kV voltage and more, including voltage level of 35kV. Consumption...
2 сеп, 2011
Respected visitors of our internet page, here you can find all the most important current information and announcements about planned disconnections and defects in electric-distributive network in the entire area of Elektrokrajina. Also, you can find general...
2 сеп, 2011
Dependent Company “Elektrokrajina” stk. comp. Banja Luka works as integral part of MH “Elektroprivreda Republike Srpske” (MH-ERS), and its duty is to supply economy and population with electric energy continuously and qualitatively on its cooperation that covers...
2 сеп, 2011
Elektrokrajina stk. comp. Banja Luka has 1.514 employees, and those are data from December 31st 2006. There are 208 or 13,74% highly educated employees. Qualification structure: Age structure: Age structure of employees shows the greatest participation of...
2 сеп, 2011
Working as integral part of Mixed Holding Elektroprivreda Republike Srpske, Elektrokrajina stk. comp. wants to participate in the process of restructuring and further development of energetic sector of Republic of Srpska and Bosnia and Herzegovina. Primarily, our aim...
2 сеп, 2011
Area 8.629 km2 Population 666.650 Total number of consumers 227.186 Annual energy consumption 1.207.213,829 MWh Maximal peak load 316 MW Average peak load 249 MW Average annual energy consumption of household 3.499 KWh Average monthly energy consumption of...
1 сеп, 2011
MANAGEMENT Director: MA Seka Kuzmanović, grad. electrical engineer Executive director for technical issue: Nenad Drljača, grad. electrical engineer Executive director for economic issues: Rodoljub Topić, grad. econ. Executive director for...
1 сеп, 2011
Elektrokrajina is organized in 10 Working units (10 RJ), and all company’s functions are united at the level of Company’s Directorate which is placed in Banja Luka. Working units that are dealing with distribution and supplying with electric energy are: ...
1 сеп, 2011
Usage of electric energy for lighting of city of Banja Luka started long time ago. In 1898, hydro power plant Delibašino selo with two turbines of 300KS each started to work, and 25 years later (1923) thermal power plant of 1100KS was built on Lauš. At that period of...
1 сеп, 2011
Primary activity Distribution, buying, selling and trading with electric energy. Beside that, the company performs projecting, constructing and maintenance of electric-power objects. History: Under different names and various forms of organization, Elektrokrajina has...